Tr13 Number

Tr13 Restoration Progress

Tr13 Number

Back to Restoration page

Tr13 Roof off 5th October 2005
Roof off. Thanks for Rod, Stuart, Mike P for their donations for the new roof.
Roof almost off 5th October 2005
Roof almost off.
Lifting roof off 5th October 2005
Lifting the roof off.
Getting roof ready to remove 5th October 2005
Getting ready to take the roof off.
Tr13 moving carriages 11th June 2005
TR13 pushing carriages around the yard.
Tr13 being paint stripped 21st May 2005
Jason and Mark having been busy stripping the TR in preparation for painting.
Preparing to paint hand brake 21st May 2005
Jason prepares to paint the hand brake.
Paint stripping roof 23rd April 2005
Jason stripping the paint off the roof.
Tr13 lifted onto rails 18th June 2003
TR13 lifted onto the rails in Feilding by crane.
Tr13 arrives in Feilding by Truck 18th June 2003
On the 18th of June 2003, Tr13 arrived in Feilding and was unloaded with a McIntosh crane and placed in our depot.

Back to Restoration page